01 / Review
Project Intake
Drawing Review · Requirement Confirmation
Available
Prepare drawings and confirm project requirements.
This page is used for preliminary project communication, drawing information review, sample status confirmation, and manufacturing requirement collection before quotation or engineering evaluation.
02 / Confirm
Requirement alignment
Material, appearance, tolerance, quantity, packaging, and delivery schedule are clarified before quotation or sample planning.03 / Prepare
Engineering input
Clear project information reduces repeated communication and helps the engineering team evaluate mold and production feasibility.File preparation guidance
Preferred files include STEP, STP, IGS, X_T, DWG, PDF, JPG, PNG, and compressed project folders. Please organize files by product name, version, material, surface requirement, and estimated quantity to improve review efficiency.
Project file package
Prepare drawings, models, sample photos, material notes, a
Status: page available · Storage: disabled · Public registration: disabled